Clean Energy Center The
"Next Generation"
Solar Home


Click here to return to the
Clean Energy Exhibition home page.

Location - Floor Plan - Excavation - Site Preparation - Rebar
Concrete Pour - Slab - Concrete Blocks - Underground Walls
Surface Bonding - Wood Framing - Waterproofing - Backfill
Subfloor - Upstairs Wall - Solarium - Downstairs Finishing
Upstairs Finishing - Tiling - CableRail Deck - Solar Array
Power Station - Wind Turbine - The Completed Home




The completed Next Generation Home as seen from in front of the Solarium. (October 24, 2006)




The main entrance is seen here on the other side of the Next Generation Home. (October 24, 2006)




A view of the Next Generation Home from the small valley below. (October 24, 2006)


Location - Floor Plan - Excavation - Site Preparation - Rebar
Concrete Pour - Slab - Concrete Blocks - Underground Walls
Surface Bonding - Wood Framing - Waterproofing - Backfill
Subfloor - Upstairs Wall - Solarium - Downstairs Finishing
Upstairs Finishing - Tiling - CableRail Deck - Solar Array
Power Station - Wind Turbine - The Completed Home


Click here to return to the Clean Energy Exhibition home page.