The area around the shower windows and Jacuzzi Capella 60 Pure Air II Bath will be tiled.




Bituthene waterproof membrane is installed in all areas to be tiled. (March 10, 2006)




Hardibacker concrete board is installed over the waterproof membrane. (March 14, 2006)




Fiberglass mesh tape and thinset mortar are installed over all seams. (March 15, 2006)




Multicolor slate tiles are installed using flexible, latex-reinforced mortar. (March 31, 2006)


Location - Floor Plan - Excavation - Site Preparation - Rebar
Concrete Pour - Slab - Concrete Blocks - Underground Walls
Surface Bonding - Wood Framing - Waterproofing - Backfill
Subfloor - Upstairs Wall - Solarium - Downstairs Finishing
Upstairs Finishing - Tiling - CableRail Deck - Solar Array
Power Station - Wind Turbine - The Completed Home


Click here to return to the Clean Energy Exhibition home page.