Clean Energy Center The
"Next Generation"
Solar Home


Click here to return to the
Clean Energy Exhibition home page.

Location - Floor Plan - Excavation - Site Preparation - Rebar
Concrete Pour - Slab - Concrete Blocks - Underground Walls
Surface Bonding - Wood Framing - Waterproofing - Backfill
Subfloor - Upstairs Wall - Solarium - Downstairs Finishing
Upstairs Finishing - Tiling - CableRail Deck - Solar Array
Power Station - Wind Turbine - The Completed Home




Backfill dirt is carefully poured around structure from the Bobcat by Jeff Gold
while Chris McShane spreads the dirt evenly around the walls. (July 26, 2005)




After every six inches of dirt is spread, Matt Williams guides a plate tamper
over it to ensure the soil won't settle later and pull down the waterproofing.


Location - Floor Plan - Excavation - Site Preparation - Rebar
Concrete Pour - Slab - Concrete Blocks - Underground Walls
Surface Bonding - Wood Framing - Waterproofing - Backfill
Subfloor - Upstairs Wall - Solarium - Downstairs Finishing
Upstairs Finishing - Tiling - CableRail Deck - Solar Array
Power Station - Wind Turbine - The Completed Home


Click here to return to the Clean Energy Exhibition home page.