Clean Energy Center The
"Next Generation"
Solar Home


Click here to return to the
Clean Energy Exhibition home page.

Location - Floor Plan - Excavation - Site Preparation - Rebar
Concrete Pour - Slab - Concrete Blocks - Underground Walls
Surface Bonding - Wood Framing - Waterproofing - Backfill
Subfloor - Upstairs Wall - Solarium - Downstairs Finishing
Upstairs Finishing - Tiling - CableRail Deck - Solar Array
Power Station - Wind Turbine - The Completed Home




In order to give the downstairs a "cabin" feel, rough-cut tongue-and-groove
cypress is installed above the exposed douglas fir joists. (July 30, 2005)




A tongue-and-groove Advantech subfloor is both glued to the cypress below,
and screwed into the douglas fir joists to prevent squeaking later.


Location - Floor Plan - Excavation - Site Preparation - Rebar
Concrete Pour - Slab - Concrete Blocks - Underground Walls
Surface Bonding - Wood Framing - Waterproofing - Backfill
Subfloor - Upstairs Wall - Solarium - Downstairs Finishing
Upstairs Finishing - Tiling - CableRail Deck - Solar Array
Power Station - Wind Turbine - The Completed Home


Click here to return to the Clean Energy Exhibition home page.