The adobe-style surface-bonded walls downstairs are seen contrasting with douglas fir
open-beam floor joists that will support a natural bamboo floor upstairs. (July 8, 2005)




The front wall downstairs (right) will have windows all the way across, overlooking a tree-filled valley
on the preserve. The raised concrete bed platform seen in the rear, will provide natural cooling
to the sleeping area in summer, and heating in winter, from the ground below. (July 10, 2005)




Framing around the Jacuzzi tub in the bathroom.


Thomson Construction


Location - Floor Plan - Excavation - Site Preparation - Rebar
Concrete Pour - Slab - Concrete Blocks - Underground Walls
Surface Bonding - Wood Framing - Waterproofing - Backfill
Subfloor - Upstairs Wall - Solarium - Downstairs Finishing
Upstairs Finishing - Tiling - CableRail Deck - Solar Array
Power Station - Wind Turbine - The Completed Home


Click here to return to the Clean Energy Exhibition home page.